Preliminary air test results on our Passive House

Before any of our electrical and plumbing work begins, we did a blower door test. This tests to see how air-tight our house is. The test we did was only a preliminary blower door test to ensure that our walls are on track to hit the target, even though not all of our windows and doors are completely sealed yet. We did some temporary taping in a few locations in order to perform the test. We also only performed a depressurization test this time (PassivHaus requires both a depressurization and pressurization test). This is because the temporary taping would have failed under pressurization.

The PassivHaus Standard requires an air tightness of 0.6 ACH50 or better. ACH50 stands for Air Changes per Hour at 50 Pascals of pressure, or the total number of times that the entire volume of air in the house will be exchanged through leakage at a given pressure. 50 Pascals is roughly 5 times the pressure that a house would experience on a cold winter day due to difference in temperatures between the inside and outside, so the test ensures that performance at everyday pressures will be ensured.

The results? We achieved 0.47 ACH50 on the first try!! We are very happy with this result. We will retest the house after the last few windows are completely installed to see how we can bring this result down even lower. The lower this number gets, the smaller and more effective our heating and ventilation system can be.

Early results predictions/friendly wagers. Here's hoping we reach Mark's 0.18 with the final.

Early results predictions/friendly wagers. Here's hoping we reach Mark's 0.18 with the final.

Construction week 29 – interior walls

Interior walls somehow make the spaces feel bigger

Interior walls somehow make the spaces feel bigger

Interior walls are complete. We are holding off on building our service cavities until Mark can perform an air test. He can’t perform the air test until the shell is completely sealed. He can’t finished sealing off the shell until he gets more tape, which he ran out of late on Friday. So...the air test will have to happen next week.

It’s important that the air test happen at this early stage because if we find gaps now, they’re easy to fix. If we wait until after we build the wall cavities, we’d have to take them apart to get at the leaks. The air test is important because the performance of our house hinges on it being of a certain value. Any amount we exceed this value, drastically improves our energy model. Our target is very aggressive, so we’re not expecting to beat it by much. But we hope so. We hope it breaks records ;)

Mark is contemplating whether or not to Periscope the air test. If you want to see it, let us know! Once we’ve run it, we’ll write another post going into a bit more detail.

What else happened last week?

  • Our flat roof was insulated. Mark spec’d a ‘dense pack’, but the installer gave us more of a ‘pillow pack’. So they had to return and fix it. Which goes to show it really helps to have a general contractor who knows what to look for. Good job Mark!
  • We installed the air vapour barrier against the basement walls, which forms part of our continuous air barrier line.
  • The plumbing vents rough-ins went in.
  • AND we settled on the lighting for our open space. It’s been a major design dilemma. And had the potential to cost muchos dineros. We got clever and are designing our own lighting system, which you shall see when it comes together in real-time. We’re very excited about ticking that one off the list.


Next week: air test!

Basement air and vapour membrane

Basement air and vapour membrane

Plumbing vents through the roof (pre-insulation)

Plumbing vents through the roof (pre-insulation)

Attic insulation (blown-in cellulose)

Attic insulation (blown-in cellulose)